Services / Specialist cleaning

Post-renovation cleaning

Prepare a renovated home or commercial space for use with a cleaning plan based on the dust level, finishes and areas handed over by the contractor. A site review or clear photos help us quote accurately.

Plan a cleaning visit

After the work, before the fresh start.

  1. 1

    Finish dusty work

    Schedule after drilling, sanding and other dusty work.

  2. 2

    Clear bulky debris

    Arrange contractor waste and large debris removal.

  3. 3

    Assess the surfaces

    Share dust, residue and finish details before choosing methods.

Price guide

Plan your cleaning budget

Proposed prices · pending owner confirmation

Parking, transport & SST are currently included in the cleaning fee.

Price guide — Post-renovation cleaning
What the price coversProposed price
Up to 800 sq ftRM330
801–1,500 sq ftRM520
1,501–2,500 sq ftRM820
2,501–3,500 sq ft; larger sites assessed separatelyRM1090

For dust and light accessible residue after contractors remove bulky waste. Heavy cement, paint, adhesive, machine treatment and high access require a separate assessment.

Optional tool set · RM50 per visit

No tool fee when you supply suitable tools and products.

  • Stepladder
  • Vacuum cleaner
  • Mop & bucket
  • Broom & dustpan
  • Microfibre cloths
  • Scrub brushes & sponges
  • General cleaning products

Tools are used for the agreed, safely accessible tasks. High-level work and specialist treatments require a separate scope.

These cleaning rates are proposed for this website preview and still need owner confirmation. Parking, transport and SST are currently included in the cleaning fee. Confirm the final scope and any selected tool add-on before booking.

View all prices and scope

Specialist cleaning

Typical scope

Dust and residue cleaning after renovation, scoped to the site's condition.

  • Remove ordinary renovation dust from agreed, accessible surfaces
  • Vacuum or sweep and clean listed floors using a suitable method
  • Wipe reachable fittings, ledges and cabinet exteriors
  • Clean agreed kitchen and bathroom fixtures
  • Collect small, non-hazardous loose debris to a client-designated point when agreed
  • Review the completed areas against the scope

Book after dusty building work is finished

Cleaning while sanding, drilling or painting continues can mean the same surfaces become dusty again. Arrange the visit after contractors finish dusty work and remove bulky debris. Send overall room photographs and close-ups of remaining paint, adhesive or cement marks. List the floor and wall finishes so the scope can be assessed without assuming that scraping or machine treatment is safe for every surface.

What a handover-ready scope needs

Include cupboards, window tracks, skirting and reachable surfaces that need attention in your request. Confirm access to water, electricity and the service lift. Rubbish hauling, high external glass, repairs and specialist residue removal are separate decisions. The quoted area should describe the actual floors and zones involved; a property listing size alone may not describe all the work.

Specialist cleaning

When this service may be a good fit

This service is for a space that is ready for cleaning after dusty renovation work has finished and the contractor has handed over the area. The quote can account for the rooms, finishes and ordinary dust that are accessible on the day.

Service area

Cleaning across Kuala Lumpur and nearby Selangor

Available in Kuala Lumpur and selected nearby Selangor areas, including KLCC, Bangsar, Mont Kiara, Ampang, Petaling Jaya, Subang Jaya, Sunway and Puchong. Send your postcode or full address so we can confirm coverage.

Check the service area

What shapes the quote

Plan the clean around contractor handover

Send the renovated floor area, current photos and expected contractor handover date. Highlight paint, cement or adhesive marks for assessment, and confirm access, water and electricity before the visit is scheduled.

Get a quote

FAQ

Service questions

When should post-renovation cleaning be booked?

After dusty trade work is complete and the contractor has handed over the areas for cleaning.

Do you remove construction waste or paint marks?

Bulky waste, paint, cement and adhesive removal are not assumed. Share photos or arrange a site review so these tasks can be assessed separately.

Can you clean before all renovation work is finished?

The site must be safe and ready for handover. Ongoing work can create new dust and may require a revised schedule.

What information helps you quote post-renovation cleaning?

Send the postcode, approximate floor area, clear photos, handover status and a list of areas or marks you want assessed.

Will the site be dust-free after one visit?

We cannot promise that no dust will return, especially if nearby work continues or the property is still being fitted out. The visit covers the agreed areas and tasks.

How much should I budget for this service?

The proposed starting budget is RM330 for Up to 800 sq ft. These preview prices still need owner confirmation. See the price table for the scope, time or item size; your final quotation must confirm any extras before booking.

What is the cancellation or rescheduling policy?

All cancellation or rescheduling requests must be made at least 12 hours before the scheduled cleaning start time. Cancellations made on the scheduled cleaning date incur a charge of 50% of the cleaning fee.

Specialist cleaning

Agree the scope before setting the schedule.

Plan a cleaning visit
WhatsAppPreview number